Project title 15 |
Conducting a Feasibility Study for installation of a 300‐400 kW solar generating capacity in Jamoat Alichur, Murgab region of GBAO. |
|
Target area |
Jamoat Alichur, Murgab region of GBAO. |
|
Goal |
To conduct feasibility study for the solar/diesel hybrid electrification of Alichur village in GBAO. |
|
Specific objectives |
· Assessment all relevant framework conditions necessary for planning; · Proposing various technical solutions and assessing their technical and operational feasibility; · Developing a detailed standard design (complete plans and estimates, including performance modeling using an appropriate modeling tool); · Obtaining a positive opinion (state expert review) on the final design from the relevant authorities. |
|
Results |
· An analysis of available energy sources (solar and wind), electricity demand, and the capabilities and readiness of future electricity consumers (27 households) in Alichur was conducted (report). · A geological and seismological survey of the pre-selected installation site was conducted. A detailed geological, topographic and seismological report with conclusions and recommendations for the construction of hybrid solar/diesel power plant was developed; · An analysis of key regulatory documents on energy resource management in Tajikistan was conducted, and a list of standards was developed that will be applied during the construction and operation of a solar hybrid system in the village of Alichur, Murghab district; · Quality of available infrastructure and services has been analysed (report); · A final feasibility study report has been developed with detailed technical data and recommendations. |
|
Duration |
February 2020 – April 2021 |
|
|
|
|
Donor |
UNDP/ GEF |